AELTCC Wimbledon - Balconies
As a site which is continually expanding and updating its facilities, we were pleased to be involved with this national institution. The balcony canopies were completed for the 2002
championships and provide shelter to the redeveloped balconies. A strict brief which required a replacement for the older canopies using new technology was accomplished with minimal steelwork and PTFE/glass mesh
fabric, essentially as flat panels. The greatest challenge was the design of the brackets to support the 3.5m deep canopies. These wre fixed using post-drlled anchors attached to the existing 1930's concrete
frame and which needed to accommodate the tolerances of the hidden rebar.